Rail-net logo
GN Drags, how they should be done.
Monday, 23rd April, 2012

Taken in April 1987 this shows how a railway can be run when Electric Multiple Units couple to locomotives, without the need for adaptor couplings, and life goes on pretty much as usual.
31000 A 31 with the Hornsey OLE mainence train stands to the south of Hitchin station during the weekend drags on the GN.
31219 A 31 prepares to be detached from a 312 during the weekend drags on the GN.
31000 A class 31 stands in the loco point during the weekend drags on the GN
47407 47407 heads north throuh Hitchin with an express during the weekend drags on the GN.
00000 A Permaquip trolley works on the line during the weekend drags on the GN
00000 A Permaquip trolley works on the line during the weekend drags on the GN
31000 A 31 stands on the Hornsey OLE Train just south of Hitchin during the weekend drags on the GN.
31219 31219 waits at Welwyn Garden City for the next turn during the weekend drags on the GN.
31219 31219 pauses at Knebworth with a 312 during the weekend drags on the GN
31219 31219 heads north at Knebworth with a 312 during the weekend drags on the GN

Return to the index

Valid HTML 4.01! Valid CSS!